JIO-BP Type B TT Inspection

Vehicle & Inspection Details
Inspection Check Points
Sr No Check Point Status Photo
TT Trucks - Driver & Helper related checklist
1. Condition of Rear View Mirrors And Blind Spot Mirror
Off
Non-Compliance

📸 No file selected
2. Eye & Fitness certified by Registered Medical Practitioner or Hospital. (Form 1 & 1A of CMVR 1989)
Off
Non-Compliance

📸 No file selected
3. Minimum age of driver is 25 years. ( MIN 3 YRS HMV Exp. As per PNGRB )
Off
Non-Compliance

📸 No file selected
4. TT Crew in Khaki colour uniform
Off
Non-Compliance

📸 No file selected
5. PPE : Safety Shoes, Helmet, Hand gloves, Mask (Mask -9913)
Off
Non-Compliance

📸 No file selected
6. Reflective tapes as per specification- 50mm width 1. White at Front 2. Red at Rear 3. Yellow at both Sides
Off
Non-Compliance

📸 No file selected
7. Crew trained on MSDS/Safety Induction, Product handling / Emergency Response by Terminal
Off
Non-Compliance

📸 No file selected
TT Trucks - Security/ Safety related checklist
8. 3 Point Seat Belts (Driver + Co-Driver) - ( Retreactable seat belts )
Off
Non-Compliance

📸 No file selected
9. TT possessing - Hydrostatic Test Pressure (0.316 Kg/cm2) (each compartment)
Off
Non-Compliance

📸 No file selected
10. Comp Capacity (No excess of 97% of gross cap. & upto 5 KL max)
Off
Non-Compliance

📸 No file selected
11. Master switch : Provided inside the cabin & in working condition.
Off
Non-Compliance

📸 No file selected
12. Fire Extinguisher : 10 Kg 2 DCP with TT number & test dates incl. 1 Kg CO2 inside the cabin.( Refill Certificate & Physical Condition )
Off
Non-Compliance

📸 No file selected
13. Availability of spill kit < 10 Liters.
Off
Non-Compliance

📸 No file selected
14. Fusible Link : Standard type provided on each master valve fitting.
Off
Non-Compliance

📸 No file selected
15. Master Valve : Provided on rear side with sealing facility.
Off
Non-Compliance

📸 No file selected
16. Fuel Tank : Guarded & no connection with compartments / extra fuel tank if any.
Off
Non-Compliance

📸 No file selected
17. Earthing boss/cleat ( Not Painted) are available on both sides of TT & TT has flexible earthing cable with robust crocodile clips.
Off
Non-Compliance

📸 No file selected
18. VTS Fittment & Working (Based on Exception Report Input)
Off
Non-Compliance

📸 No file selected
TT Trucks - Inspection & Fittings related checklist
19. Each bottom delivery valve is provided with separate security lock.
Off
Non-Compliance

📸 No file selected
20. Each Dome cover at top is provided with separate security lock.
Off
Non-Compliance

📸 No file selected
21. Dip hole / manhole located in the geometrical centre of each Comp.
Off
Non-Compliance

📸 No file selected
22. Caps on faucets/fill pipes/dip pipes : Of Aluminium or Brass
Off
Non-Compliance

📸 No file selected
23. Dip pipe provided & welded to the manhole cover
Off
Non-Compliance

📸 No file selected
24. Fill Pipe provided and welded to the manhole cover
Off
Non-Compliance

📸 No file selected
25. Dip hole fitted with perforated dip pipe extending up to approximately 6 cm. from the bottom of the tank.
Off
Non-Compliance

📸 No file selected
26. Dip hole fitted with perforated dip pipe with its internal end open and all openings covered with two layers of wire gauge 11 mesh/cm.
Off
Non-Compliance

📸 No file selected
27. Any additional fittings other than PV vent, dip pipe, emergency vent and fill pipe are not fitted on the manhole cover.
Off
Non-Compliance

📸 No file selected
28. Any bumps or dents are not present on the tank
Off
Non-Compliance

📸 No file selected
29. Tank is not having any concealed compartments.
Off
Non-Compliance

📸 No file selected
30. No unauthorized modifications / extra fittings inside the compartments found.
Off
Non-Compliance

📸 No file selected
31. Fill pipe of mild steel of size 100 mm nominal bore and flange mounted to the manhole base plate is provided.
Off
Non-Compliance

📸 No file selected
32. Internally, the fill pipe is extended till almost bottom of the compartment leaving a clearance of 25 mm.
Off
Non-Compliance

📸 No file selected
33. Inner end of filling pipe is having splash deflector arrangemen ( 45º Angular Cut).
Off
Non-Compliance

📸 No file selected
34. Fill pipe is not slotted and contains only 4 nos holes of 13 mm dia above the product level.
Off
Non-Compliance

📸 No file selected
35. Dip pipe contains min 5 nos perforations spread uniformly throughout its length.
Off
Non-Compliance

📸 No file selected
36. Neoprene discharge hose having braided wire spirally wound along the length is available.
Off
Non-Compliance

📸 No file selected
37. Hose shall have Brass / Aluminium coupling on both ends & electrically continuous. Condition of the hose is good. PVC/Plastic hose is not permitted
Off
Non-Compliance

📸 No file selected
38. Design of Tanks : Design of tanks is standard type & not rectangular or any other shape.
Off
Non-Compliance

📸 No file selected
39. Dimension of tank : Matching with calibration chart
Off
Non-Compliance

📸 No file selected
40. Top Fittings : Welded to manhole plate & enclosed in the dome cover
Off
Non-Compliance

📸 No file selected
41. Position of manhole cover fittings : Matching with calibration chart
Off
Non-Compliance

📸 No file selected
42. Manhole Cover : Sealed and the seal number matches with the one mentioned in the calibration chart after calibration.
Off
Non-Compliance

📸 No file selected
43. Nuts on fly wheel : Plate shall be welded at both sides of flywheels. Dimension of strip shall be 15 mm X 3 mm. Material : MS
Off
Non-Compliance

📸 No file selected
44. Sindle/Gland check nut and flywheel securing plate: Material :MS. Shall be fixed on hinges welded from inside.
Off
Non-Compliance

📸 No file selected
45. Shall have tower bolt from both sides to secure the plate in vertical position when valve box is in closed position.
Off
Non-Compliance

📸 No file selected
46. Faucet Valve Box : Material MS. Tapered plate on both sides shall cover Box.
Off
Non-Compliance

📸 No file selected
47. Hinges on Valve Box : Material MS. Hinges shall be provided and welded for entire width of valve box from inside.
Off
Non-Compliance

📸 No file selected
48. Back side plate : Material MS. Shall be placed up to 1'' above pipeline.
Off
Non-Compliance

📸 No file selected
49. Locking arrangement on valve box : Stainless Steel. Locking rod shall not be painted. Rod shall get inserted min 2.5'' inside the valve box.
Off
Non-Compliance

📸 No file selected
50. Dome Cover : Material MS. Thickness not lesser than 1 mm. Shall have slope to avoid accumulation of water.
Off
Non-Compliance

📸 No file selected
51. Hinges on dome cover : Material MS. Shall be machine made. Welded from inside for entire width. Opening > 90 degree and < 120 degree with stopper.
Off
Non-Compliance

📸 No file selected
52. Inner/base ring of dome cover : Material MS. Base ring thickness 1 mm. Base ring of dome cover shall not be lesser than 100 mm.
Off
Non-Compliance

📸 No file selected
53. Inner/base ring of dome cover : Distance between manhole and inner ring shall not be more than 10 mm in closed condition.
Off
Non-Compliance

📸 No file selected
54. Locking arrangement : Locking rod 20 mm dia. Locking rod and cleat or any other stainless steel items shall not painted.
Off
Non-Compliance

📸 No file selected
55. Locking arrangement : Both vertical and horizontal locking cleats are 6 mm thick. Material for locking cleat and rod are stainless steel.
Off
Non-Compliance

📸 No file selected
56. Intermediate flanges bolt security : Material : MS. The welding should be done for all pair of nuts and bolts.
Off
Non-Compliance

📸 No file selected
57. Master valve check nut : Material : MS. Thickness: 3 mm for washer and 2 mm for strip. Should be welded on the valve spindle housing.
Off
Non-Compliance

📸 No file selected
58. Sealing of manhole cover : Small hole to be available in stud/bolt for passing the sealing wire. Shall have external collar for manhole
Off
Non-Compliance

📸 No file selected
59. Master valve box : Material : MS. Thickness : 2 mm. MS plate box type arrangement provided encasing the emergency/master valve levers.
Off
Non-Compliance

📸 No file selected
60. Hole on faucet valve spindle : Small holes are provided on the spindle and body of the valves for passing the sealing wire through the flywheel of the valves.
Off
Non-Compliance

📸 No file selected
61. Speed governor is provided and is in functional condition.
Off
Non-Compliance

📸 No file selected
62. ABS is provided and is in functional condition
Off
Non-Compliance

📸 No file selected
63. Electrical fittings has no trace of non standard equipment presence or use such as cabin fans / mobile chargers etc.
Off
Non-Compliance

📸 No file selected
64. TT is provided with under run protections ( side / rear )
Off
Non-Compliance

📸 No file selected
65. TT is provided with toe guards or anchor point for the application & use of safety harness at unloading points.
Off
Non-Compliance

📸 No file selected
66. Physical Condition of TT Tyres--Minimum with 2 MM depth with no cuts / patch / bulge
Off
Non-Compliance

📸 No file selected
67. Condition of ladder at rear
Off
Non-Compliance

📸 No file selected
68. Any Rusting/ Damage Observed in tank
Off
Non-Compliance

📸 No file selected
69. Head light, tail light and brake lights working
Off
Non-Compliance

📸 No file selected
User Information
📸 No file selected